Vancouver, British Columbia, January 18, 2022 – Total Helium Ltd. (TSX-V: TOH; TTLHF) (“Total Helium” or the “Company”) is pleased to announce that the Boltz 35B well has been completed with production tests ongoing. Additionally, 20 miles away from the Boltz 35B well, the Miller 9C Saltwater Disposal well has been drilled to 5,993 feet and casing has been set and cemented. On the same section of land, the drilling rig has moved and the Miller 9D production well has been spudded.